§ 34-475. Permanent control points.  


Latest version.
  • Permanent control points shall be provided in accordance with F.S. ch. 177. Where required improvements are constructed prior to the recordation of the plat, the permanent control points shall be set prior to submission of the final plat and certified by the surveyor on the plat. Where required improvements are constructed after recordation, the guarantee for the improvements shall incorporate placement of permanent control points and the surveyor's certificate shall indicate that permanent control points will be set within one year from the date of recording of the plat under surety posted with the village for the required improvements.

(Code 1994, § 30-325)

State law reference

Permanent reference monuments, F.S. § 177.091.